Gotemba and Subashiri Trails Now Open To The Summit

4plus's picture

Posted by 4plus on July 8th, 2008

Tags:

We can now climb up Gotemba Trail to the summit as the regulation was removed today, July 8. Subashiri Trail has already been open to the summit on July 4. The only trail left is Fujinomiya Trail, on which we are allowed to climb only up to the 9th station at this point.